Remet Corporation
Wax Casting Plant Installation
Scope of Work:
- Installed 60 ton air cooled chiller
- Installed 5M BTU gas fired boiler
- Installed compressed air plant
- Installed all mechanical piping & pumps for the systems
- Installed closed loop filters, wax product conveyor system, motor controllers, temp. sensors, & (5) new VFD’s
- Installed (4) chilled water fan coil units/piping/duct